| Installation - Floor Plan |
| |
| Installation of the ECO series cable access
tiles is quick, easy and cost-effective. Following is the basic procedure for
a typical floor plan. |
| |
- Select two longest right-angle walls as starting lines for first rows full
size UniPanel.
- First step, apply Sound Attenuation Blanket.
- Then, plan the first piece UniPanel at the right-angle or recess to measure
the 2 starting lines as shown in the drawing below. Connect first row UniPanel
by half-size Base Connector along the starting walls. Allow 2 mm clearance between
UniPanel and wall in order to avoid squeeze due to deviation of the wall.
- Continuous connection of UniPanel by Base Connector is simple. Steel Trench
Cap may be installed before or after routing of cables.
- Ramps and perimeters installation plan also shown below:
|
| |
| 
|
| |